鋼筋加工棚搭設(shè)標(biāo)準(zhǔn)介紹
來(lái)源:http://www.beiyangkong.cn/ 發(fā)布時(shí)間:2023-03-30
鋼筋加工棚,工地鋼筋防護(hù)棚詳解,鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的場(chǎng)地。鋼筋加工棚長(zhǎng)和寬尺寸,要根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6×
The reinforcement processing shed is a site for reinforcement processing operations such as straightening, bending, and welding of reinforcement on the construction site. The length and width of the steel bar processing shed should be determined based on the number of steel bars processed and the number of machines used. Generally, there are 6 ×
9m、6×
9m、6 ×
12m、9×12m等幾種,可以根據(jù)實(shí)際情況酌情采用,也可自行設(shè)計(jì)長(zhǎng)寬尺寸。
12m、9 × Several types, such as 12m, can be used according to actual conditions, or you can design your own length and width dimensions.
工地鋼筋棚的搭設(shè)還要注意一下幾點(diǎn):
The following points should be paid attention to when erecting the reinforcement shed on the construction site:
1.工具式鋼筋加工棚搭設(shè)具體尺寸根據(jù)現(xiàn)場(chǎng)實(shí)際情況確定。
The specific size of the tool type reinforcement processing shed shall be determined based on the actual situation on site.
2.搭設(shè)在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車(chē)間設(shè)置雙層硬質(zhì)防護(hù)。
2. The processing workshop set up around the turning radius of the tower crane and the building shall be provided with double layer hard protection.
3.加工車(chē)間地面需硬化,宜選用砼地面。
The ground of the processing workshop needs to be hardened, and concrete ground should be selected.
4.加工車(chē)間頂部應(yīng)張掛警示標(biāo)識(shí)和宣傳用語(yǔ)的橫幅,橫幅寬度宜為1m。
The top of the processing workshop should be hung with safety warning signs and safety propaganda banners, with a width of 1m.
5.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2000mm×1000mm。
5. The tool type reinforcement processing shed shall be hung with an operation specification drawing board at a conspicuous place, and the size of the drawing board is: wide × Height=2000mm × 1000mm。
6.各種型材及構(gòu)配件規(guī)格為參考值,具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算。
6. The specifications of various profiles and components are reference values, and the specific specifications should be calculated based on local wind load and snow load.
7.南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
In the southern region, in case of typhoon, wind prevention measures should be taken, and wind cables can be installed.